From: route@monster.com
Sent: Friday, April 15, 2016 10:20 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: CS UT
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
Cover letter
Telecom
Professional
My cultures are inclusive, honest, and inspirational. References; Tony Decker Ericsson PM 425-281-5534 Rob Moreno VP.BergElectric 310-337-1377 Scott Obler President of Allen Packaging Company 714-235-6342 Masekela Lewis Masekela_lewis@yahoo.com 424-206-3692 PROFESSIONAL
EXPERIENCE: Concerned Citizens of SCLA Site Acquisition / Property manager Jan 2015 – Present: Manager (job between contracts) Responsibilities: ·
Work
with a team of 6 managers 220 residential and commercial properties ·
Manage
construction Crews ·
Market
properties for new tenants ·
Handle
day to day legal issues ·
Handle
crews repairs and maintenance issues ·
Conducted
regular property inspections ·
Managed
and updated Excel databases for the rental properties Wavsys-Tmobile Integration
Engineer September –December
2014
Bergelectric Corp – Los
Angeles, CA
PM over Wireless Business
development
October 2013 to Present
· Responsible for National wireless plan from Market to
Market OSHA 500 Certified, First Aid, CPR and Certified Safety expert
trainer. · Created the wireless protocols for Bergelectric Wireless
Division. Responsible integration teams and training Microwave
crews and climbers . · Maintained multiple crews time scopes of work Quality
safety and productivity. · Implemented and assured quality per OSHA/ ANSI standards
Sprint AT&T Quality/ Safety Standards. · Responsible for generating close outs · Established and defined all potential hazards and controls
at the site pre-construction through closeout. · Conducted telecommunications equipment and safety training
for all Wireless Division employees’ certification classes. IWG for Sprint -
Los Angeles, CA Integration
Engineer · Responsible for National deployment plan from Market to
Market implanting the protocol from Atlanta, North Carolina, Kentucky, Texas
and the Rocky Mountain Region · OSHA 500 Certified, First Aid, CPR and Certified Safety
Expert. Maintained the
crews timework Quality and productivity. Vendor Liaison · Implemented and assured quality standards per · Responsible for generating and logging all JSA. · Established and defined all potential hazards at the site
during pre-construction through closeout. · Quality Inspector for the Sprint Network vision project. · Conducted site walks, BOM’s and close out packages
regarding quality issues. · Conducted OSHA 10 safety training for all employees and
CPR certification classes. Sprint Network
Visions - Irvine,
CA
Safety Quality
Control Manager April 2012 to July
2013 · Implemented and assured quality standards for OSHA/Sprint
Safety Standards. · Performed the Site Inspection, Site Audits and Asset
Tracking for Sprint. · Performed QC/QA Inspections, coordinated with Vendors and
the Construction teams regarding the Final Punch and Site Acceptance walks
ALU site builds, troubleshooting, completing Site Audits and acceptance
checklist, photos, updating sprint database and all applicable issues. · Asset tracking through Sprint’s tracking software Atlas. · Conducted OSHA 10 safety training for all employees and
CPR certification classes. Ericsson / Alcatel
Lucent – Los Angeles / Irvine CA. Quality
Construction Manager September 2011 to
April 2012 · Ensured safety and direction of Tower Climbers. Completed
installation and alignment packages to customer in prescribed format. · DUW30 SAR8 and 7705 router installations ALU.
Programmed, integrated, and was in charge of Troubleshooting in the Southern
California market. Completed installations, loading of scripts and green
light testing. · Performed installations, programming and trouble shooting
and Microwave Pathing of Dragonwave, Red-Line, E-band , ALU MPR9500 and
Motorola Microwave 11g, 18g and 23g High/Low Radio Links. · Installed, configured and aligned the Horizon Duo and
Compact IDU System. · Performed Cross referenced Link Configurations, Azimuth,
TX power, Frequencies, Polarity and Equipment. · Aligned Microwave Radio Path utilizing RSL and Voltmeter to
obtain specified configuration. · Installed wiring and hardware at sites as needed. · Tested and troubleshot LMR400, Cat5 and Andrews Coax to
meet Clearwire standards. · Completed software version upgrades. Nexius Solutions,
Clearwire - Overland Park, Kansas Consultant November 2008 to
September 2011 · Managed the Clearwire Microwave project in Overland Park,
Kansas. · Provided training for the Microwave Technicians and Tower
crew. · Responsible for managing the Closeout packages, Final
Punch and Site Acceptance Walks. · QC/QA Inspections, coordinating with the Vendors and
Construction Crew for Clearwire. · Ensured safety and direction of Tower Climbers. Completed
installation and alignment packages to customer in prescribed format. · Developed and implemented communication plan regarding
on-going strategic initiatives. Goliath - Southern
California PM October 2008 to
November 2008(Contract) · Performed the site walks, completed the checklists,
reviewed the construction photos and cabling installations per Go-sol floor
plans and install standards. · Completed DAS installations and integrations, completed
state of health system checks and trouble shooting of stores in my region. · Handled the supervision and scheduling of supervisors and
laborers in daily operations. · Managed a team of Field Technicians and Subcontractors. · Performed surveys, bid walks, pre-construction visits, bid
auctions, site inspections, final punch and site acceptance diagnostics and
any punch lists issues. AT&T - Los
Angeles, CA Construction
Manager (Vrad Fiber Project) July 2007 to August
2008(Contract) · Inspected and verified aerial, buried and underground
terminals, photos and completing checklists. · Responsible for updating OSP database, checked for RA's
and damaged handholds and encapsulated splices in handholds, grounds,
conduits, lead cables and potential safety issues as applicable to OSP
upgrades. · Supervised and managed schedules for a team of
Construction Supervisors, Field Technicians and subcontractors for the
AT&T Vrad Fiber Project. Ericsson for
T-Mobile - Brea, CA Project Manager
over Technical Site Audits March 2007 to April
2007(Contract)
· Conducted site audits, Reviewed and corrected audit forms
and trained staff to conduct the · Performed audits on 2106 installations and integrations. · Monitored the quality and site photo completion for Close
Out Packages in compliance with T-Mobile standards. · Responsible for site verifications and visual inspections
of quality on site. Rapid Broadband -
Reno,
NV
Consultant January 2007 to
April 2007 (Contract) · Performed preliminary site walks, reviewed the photos,
detail drawings, measurements, trained installers complete physical site
assessment documents and send in Close out information for 4g-Lucent project. · Sprint/Nextel, created and maintained excel trackers,
Tracked warehouse inventory, scheduled site visits. · Created construction drawing templates and site
construction specifications. · Responsible for managing Bills of material and financial
control of materials. · Managed and reported on inventory, performing checklists
to ensure projects were completed on time. Cingular Wireless Consultant October 2005 to
January 2007(Contract) · Integrator, E911, UMTS Installs · Integrator, Troubleshooter, Installed and Commissioned new
site builds. · Responsible for LMU installation, testing and re-homing
and close out packages. · Corresponded with Bechtel on all outstanding technical
issues, to ensure the project was completed on time. · Conducted Quality and Safety training for Installers and
Integrators. TNS –
Harvesting 884/882 Los Angeles, CA Construction
Manager /Tech March 2005 -
September 2005 (Contract) · Decommissioned and removed Ericsson TDMA equipment.
Harvested 884/882 cabinets, took Site Photos, scheduled pick-ups and delivery
of old equipment , packaged and shipped equipment, Maintained tracker · Managed all Integrators and Installers. · Managed the logistics of the Harvested equipment. · Managed all crews to ensure all projects were completed on
time. Pacific Telecom -
LA, NY, NJ Project Manager/
Tech October 2004 to
February
2005(Contract)
· Managed the Delta Power Upgrades for Pacific Telecom. · Managed subcontractors, Oversee Delta Power Upgrades.
Supervised Installs/Installers, Created and Maintained trackers. · Performed the pre-inspections and post-construction
audits. · Managed employee schedules, on-call rotations and approved
overtime for subcontractors. · Responsible for managing Bills of material and financial
control of materials. Mycom for Nokia -
FL Lead Installer,
Integrator Field Technician, installed/integrated May 2004 to August
2004 · Installed and integrated Ericsson radio base stations from
Fort Meyers to Orlando Florida. · Responsible for the installation, integration and QC
inspections of the cell sites and the installations per construction
drawings. · Met with vendors and construction team to perform the site
walks, site photos and review the close out packages. Nokia - Los
Angeles,
CA
August 2003 to
April 2004 · BTS expert installer, commissioning and integration for
Nokia equipment. · Managed the cabinet installation, integration and
commission. · Configuration and commissioning of NOKIA BTS. · Completely responsible for Integration, Installation and
Testing of BTS. EXI for Nokia - Los
Angeles and Chino, CA Field Technician
II/ TSS Coordinator August 2003 to
November 2003 · Coordinated the growth and expansion plan of all BTS in
Los Angeles region as lead site surveyor, installation, commissioning and
integration for Nokia 3G project. · Technical site surveys to ensure the cell sites were in
accordance with Nokia standards. · Responsible for reviewing the close-out packages, site
audits, utility site walks, pre-construction meetings and punch lists Westower - Los
Angeles, CA Project Climber
-Supervising Technician September 2001 to
August 2003 · Coordinated the growth and expansion plan of all BTS in
Los Angeles region including site survey, LNA installation, commissioning and
integration for Nokia 3G project. · Spearheaded recycling program for local warehouse. · Nokia Certified: Crew Leader and TSSR Leader. Flextronics Network
Services - Los Angeles,
CA
January 2000 to
August 2003 · Installed RF equipment, performed pre-installation, site
documentation, equipment delivery, and site layout and equipment inspection. · Prepared work sites for installation Read blueprints and
floor plans to successfully implement installation procedures. Installing,
commissioning, integrating, connecting, fine tuning and troubleshooting power
and RBS equipment Pearson Technical
Service - Los Angeles,
CA
Underground
Locator/Inspector 1996 to 1998 · Perform daily inspections of underground and aerial
construction project on a West Los Angeles GTE property. · Developed daily logs and procedures to ensure timely
completion of scheduled work and resolve problems. · Communicated with Project Engineers and to ensure accuracy
of all maps and drawings. AT&T – Los
Angeles, CA Cable Installer 1995 to 1996
(Contractor) · Reading floor plans. · Measuring, pulling, stripping and installing various types
of cable (coaxial, cat 5, muxs and fiber optics). · Align relay racks and cabinets. · Testing and troubleshooting. · Install cable T.V and node. Education Bachelor of Sociology Minor in Public Administration California State University Dominguez Southern University- Baton Rouge Honors Engineering Baton Rouge Louisiana SAFETY SUMMARY: OSHA 500 certified
Trainer (certified to issue OSHA 10hr –and- 30hr cards) First Aid Trainer
(certified to issue CPR first add cards) CPR and ESH
certified Trainer EHS professional Certified by the OSHA training Institute TECHNICAL SUMMARY: Wireless
technologies such as; LTE, DAS,small cells,4G,3G 2G UMTS,GSM, CDMA, TDMA,
VSAT, Tower to Ground Testing and inspections ,Cabling, per CO standards,
Cingular/AWS AT &T/ SPRINT standards. Performed numerous
Green Light testing, DSO, E911, PSAP test, calling, troubleshooting, drive
testing, QC, Technical Site, Surveys /Audits and Close Out documentation.
Ericson, Nokia, ALU BTS certified Tech with experience on Ericson 2106.2206
6602 3206 ALU 9928, 9927 NOKIA ULTRA SITE |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|